Document Type

Article

Publication Date

2017

Abstract

This Article reviews Environmental Impact Statements (EIS) completed in conjunction with Resource Management Plan (RMP) revisions conducted by the Bureau of Land Management (BLM) in Colorado, Montana, Utah, and Wyoming between 2004 and 2014. Based on our review of sixteen EISs, we found that RMP revisions increased application of more protective surface use stipulations by statistically significant amounts without causing a statistically significant change in either the number of jobs created or the pace of oil and gas development. In fact, both the number of jobs created and wells drilled increased slightly despite strengthened environmental protections. We also found that Draft RMP EISs that are completed on an accelerated timeline come with a heightened risk that supplementation will be needed. The delays associated with preparing a Supplemental EIS far outweigh the timesaving associated with fast-tracking Draft EIS preparation and provide a strong caution against rushing the NEPA process.

Share

COinS